Temporary Traffic Changes from 23 November
The Barcelona city council has confirmed that the next phase of Plaça d’Adrià remodelling project will bring temporary traffic disruptions to streets in the Sarrià-Sant Gervasi district between Monday 23rd November and 11th December 2026. Work will focus on the junction of Carrer de Vallmajor and Carrer de Ravella, resulting in a full vehicle traffic closure at the intersection. Pedestrian access will remain unaffected throughout the works, and local residents and emergency vehicles will retain access at all times. An alternative traffic route will be in place via Carrer del Camp, Carrer de Prats de Molló, Carrer de Mandri, Carrer de Vico and Carrer de Freixa.
Single-Day Closure on Carrer de Santaló
A separate, one-day closure is scheduled for Saturday 28th November on Carrer de Santaló, near Plaça d’Adrià. During this intervention, traffic will be diverted via Carrer de Copèrnic, Carrer de Modolell, Ronda del General Mitre and Carrer del Camp. The direction of traffic on Carrer del Camp, between Carrer d’Hercegovina and Carrer de Prats de Molló, will be temporarily reversed. Additionally, the stretch of Carrer de Santaló between Carrer de Copèrnic and Plaça d’Adrià will become a no-stopping zone.
Bus Route V13 Adjustments
The V13 bus line will experience temporary changes, with some stops suspended and alternative stops put in place during the affected dates. Passengers are advised to check real-time updates via the city’s public transport portal. The overall project aims to improve accessibility, expand green space and reduce vehicle dominance in the area, aligning with the city’s broader urban pacification strategy.
Residents and commuters are encouraged to plan alternative routes during the closure periods. Full details of the traffic diversions and works schedule are available on the Ajuntament’s official website.
Sources: Ajuntament de Barcelona.