25,000m² park opens at foot of Montjuïc
A new urban park of nearly 25,000 square metres has opened at Can Clos in the Sants-Montjuïc district, marking the completion of a redevelopment project that restores green space to a former industrial site on the lower slopes of Montjuïc. The park, which opened on 7th February 2025, spans two areas separated by an existing urban zone and connects the La Marina de Port neighbourhood more directly with Montjuïc. The project, led by the Municipal Institute of Urbanism over nearly three years since spring 2022, reclaims land once scarred by quarries and brick factories. According to the Barcelona City Council, a total of 24,700m² has been redeveloped, with 14,400m² dedicated to landscaped green areas. The transformation is part of the city’s Climate Plan to add 40 hectares of green space by 2027.
Two zones with woodland, paths and play areas
The larger section of the park covers 20,100m² and combines a 9,400m² Mediterranean forest with a 10,700m² urban promenade. The forested area follows the natural slope of the mountain, linking to the Club Natació Montjuïc via accessible paths from the old Camí de Can Clos. The promenade includes a central flowerbed that collects rainwater and runoff, returning it to the subsoil. An inclusive children’s play area of approximately 450m² features swings, a slide, ropes, spinning equipment, and a climbing wall integrated into the terrain with adapted ramps. Benches, backed seating, a drinking fountain, three bicycle parking zones, and low-energy lighting have also been installed. A second, 4,600m² area includes 2,340m² of landscaped space, new accessible routes from Carrer dels Ferrocarrils Catalans, and a newly created square in front of Carrer de Riudaura.
236 native trees planted, green walls installed
To green the site, 236 trees have been planted, primarily pines, almond trees, and olive trees, accompanied by native shrubs and meadows that require minimal irrigation. Vertical surfaces have been covered with climbing plants to integrate vegetation across the site. Basic utilities, including water, electricity, gas, and fibre optics, have also been renewed.
Four housing blocks to rise around the park
Four new buildings, ranging from five to seven storeys, will be constructed around the park. Two private residential blocks, each with 62 apartments, are already under construction. Two additional blocks will provide public subsidised housing, with 64 and 17 units respectively, and construction is set to begin soon.
Residents voting on official park name
Although the park is open, it has not yet been officially named. The Eix de Cultura i Memòria Històrica de la Marina and the Sants-Montjuïc district have launched a participatory process for residents to choose from three proposed names: Jardins del Tren de la Potassa, Jardins de les Vinyes de Can Clos, or Jardins del 8 d’Abril. Voting is open in person at the Casal de Barri de la Vinya until 18th February 2027. The winning name will be submitted to the Barcelona City Council’s Nomenclature Committee and require final approval at a Sants-Montjuïc district plenary session.
Residents who wish to vote can do so at the Casal de Barri de la Vinya. More information about the park’s design and construction is available on the Barcelona City Council website.
Related on Barna.News
Sources: Barcelona Secreta, Ajuntament de Barcelona.