> ## Content Index
> Fetch the complete content index at: https://barna.news/llms.txt
> Use this file to discover other available public pages before exploring further.

# Work starts on Montjuïc tennis centre roof
- URL: https://barna.news/work-starts-on-montjuic-tennis-centre/
- Published: 2026-11-22T12:36:01.000Z
- Updated: 2026-11-22T12:36:01.000Z
- Description: The €204,670 renovation of the municipal sports centre’s main building is expected to finish in March 2027.
- Author: Barna.News News Desk
- Tags: Sport, Trending Now

Work has begun to replace the roof of the main building at the Montjuïc Municipal Tennis Courts, Barcelona City Council said on Sunday 22nd November. The project at Carrer de la Foixarda 2-4 is expected to take around four months.

For people who use the sports centre, the council says the renovation is intended to improve the building’s energy efficiency and comfort, as well as protect its wooden structure. Completion is planned for March 2027.

Institut Barcelona Esports, the city’s sports authority, is funding the work in full at a cost of €204,670.37, including VAT, according to the [council’s announcement](https://ajuntament.barcelona.cat/premsa/2026/11/22/comencen-les-obres-de-renovacio-integral-de-la-coberta-de-les-pistes-municipals-de-tennis-montjuic/?ref=barna.news).

## Roof replacement and repairs

The council says the project is intended to protect the building over the long term. The work includes:

- Replacing the existing roof and installing waterproofing and thermal insulation.
- Reinforcing the wooden structural elements.
- Improving rainwater collection and repairing interior damage caused by damp.

The new insulation is intended to improve energy efficiency, while protection of the existing structure is expected to extend its useful life, the council says.

The city’s [contracting portal](https://licitacions.bcn.cat/site/32/licitacion/licitaciones/detalle?id=17396762&ref=barna.news) lists the roof rehabilitation contract as awarded under reference 032\_26000146\. The portal also lists the project’s technical and administrative documents.

---

## A sports centre with roots in 1929

The municipal sports facilities have origins in Barcelona’s 1929 International Exposition, according to the council. The renovation is intended to preserve a building linked to that sporting history.

The centre has six clay tennis courts, three padel courts and two swingball courts. It also has outdoor pools for adults and children, a lawned sunbathing area, a weights gym and a table tennis table.

BARNA reported on 10th August 2026 that the outdoor pool had opened to non-members for the summer. At the time, a day ticket cost €12 and visitors had to book in advance through the club’s website.

La Torre de Barcelona reported in August that the municipal tennis complex was transferred to Reial Societat de Tennis Pompeia in 1951, on condition that the club maintained and managed it.

---

*Sources:* [*El Periódico*](https://www.elperiodico.com/es/barcelona/20261122/barcelona-obras-tenis-montjuic-cubierta-principal-ayuntamiento-136715242?ref=barna.news)*,* [*Ajuntament de Barcelona*](https://ajuntament.barcelona.cat/premsa/2026/11/22/comencen-les-obres-de-renovacio-integral-de-la-coberta-de-les-pistes-municipals-de-tennis-montjuic/?ref=barna.news)*,* [*diaricatalunya.cat*](https://diaricatalunya.cat/barcelones/barcelona/renoven-la-coberta-de-les-pistes-de-tennis-montjuic-per-204670-euros?ref=barna.news)*,* [*Barna.News*](https://barna.news/montjuic-tennis-club-pool-opens-to-non/)*,* [*Tot Barcelona*](https://www.totbarcelona.cat/societat/piscina-club-esportiu-historic-montjuic-obre-primer-cop-public-734384/?ref=barna.news)*.*

Earlier coverage: [Montjuïc tennis club pool opens to non-members](https://barna.news/montjuic-tennis-club-pool-opens-to-non/)