> ## Content Index
> Fetch the complete content index at: https://barna.news/llms.txt
> Use this file to discover other available public pages before exploring further.

# Green Upgrades Planned for Sant Feliu Neighbourhoods
- URL: https://barna.news/green-upgrades-planned-for-sant-feliu/
- Published: 2026-10-31T14:00:11.000Z
- Updated: 2026-10-31T14:00:11.000Z
- Description: Major public space renovations set for Roses-Castellbell and Mas Lluí, including street renaturalisation and new community facilities.
- Author: Barna.News News Desk
- Tags: Urban Development

## Renaturalisation of Carrer de Marquès de Monistrol

Carrer de Marquès de Monistrol in Sant Feliu de Llobregat will be transformed into a green corridor linking Parc Europa with the Collserola Natural Park. Currently a paved street with limited greenery, the project will introduce vegetation, flowerbeds, cobblestone paving and wide sidewalks to improve pedestrian access and climate resilience. The design maintains a central lane for vehicles and cycling, while preserving access to driveways and loading zones. Sustainable drainage and water infiltration will be enhanced through permeable materials and increased planting. The project, budgeted at €1,493,511.40 including VAT, has been approved and is scheduled to begin in the second quarter of 2027, with construction expected to last eight months. It forms part of broader urban upgrades linked to ongoing undergrounding works in the city.

---

## Traffic Calming in Carrer de Girona Square

The redevelopment of Plaça del Carrer de Girona includes traffic calming measures on Carrer de Marquès de Monistrol and Carrer de Carles Buïgas. The plan introduces a single-level surface to prioritise pedestrian movement and improve urban connectivity. New pedestrian routes will be created, including a connection from the intersection of Carrer de Carles Buïgas and Carrer de Matilde Bertran. Sustainable Urban Drainage Systems (SUDS) and a reclaimed water irrigation network will be installed to manage rainwater sustainably. Additional green space, shaded rest areas and new children's play zones are planned. The project, with a budget of €1,666,370.22 funded by the Barcelona Metropolitan Area, is expected to be approved in November 2026 and start construction in the second quarter of 2027.

> This project is part of the Barcelona Metropolitan Area's Environmental Sustainability Plan, aiming to strengthen sustainable urban mobility policies and promote ecological transition.

---

## New Underground Facility in Plaça Dicià

A new multipurpose underground facility will be built in Plaça Dicià, funded by the Barcelona Metropolitan Area with a budget of €1,355,000\. The space will host associative activities and serve as the new rehearsal hall for Castellers de Sant Feliu. The surrounding area will also be redeveloped to improve public use and green space. The project aligns with the city’s wider investment in public infrastructure and environmental sustainability, as outlined in the Municipal Investment Plan 2024–2027.

---

*Sources:* [*Sant Feliu de Llobregat*](https://santfeliu.cat/go.faces?xmid=1467&newid=40510&language=ca&ref=barna.news)*,* [*Ajuntament de Barcelona*](https://ajuntament.barcelona.cat/superilles/sites/default/files/210303%5Fwinners%5Fsuperillabarcelona%5Fen.pdf?ref=barna.news)*,* [*santfeliu.cat*](https://www.santfeliu.cat/go.faces?xmid=44568&ref=barna.news)*,* [*Diputació de Barcelona*](https://cido.diba.cat/contractacio/19224115/serveis-de-redaccio-del-projecte-executiu-i-direccio-de-les-obres-de-la-renaturalitzacio-del-carrer-marques-de-monistrol-ajuntament-de-sant-feliu-de-llobregat?ref=barna.news)*.*

---

### Related on Barna.News

- [Barcelona Upgrades Power Grid for Climate Resilience](https://barna.news/barcelona-upgrades-power-grid-for/)
- [Port of Barcelona Approves €104.5m Terminal Revamp](https://barna.news/port-of-barcelona-approves-104-5m/)
- [Updated: Underground Car Park and Bus Station Proposed for Clínic-UB Campus](https://barna.news/underground-car-park-and-bus-station/)