> ## Content Index
> Fetch the complete content index at: https://barna.news/llms.txt
> Use this file to discover other available public pages before exploring further.

# Flood Prevention Work Starts on Carrer de Campoamor
- URL: https://barna.news/flood-prevention-work-starts-on-carrer/
- Published: 2026-11-16T18:10:19.000Z
- Updated: 2026-11-16T18:10:19.000Z
- Description: Construction begins to protect Bellvitge homes after October’s historic flooding left residents displaced and cars destroyed.
- Author: Barna.News News Desk
- Tags: Urban Development

## Work Underway to Prevent Repeat of October Floods

Workers have begun construction on carrer de Campoamor in Bellvitge, L’Hospitalet, to prevent further flooding after torrential rains in early October caused severe damage to homes and vehicles. The works, confirmed on Monday 16th November 2026, follow one of the wettest nights on record in the Barcelona metropolitan area, when up to 220 litres of rain per square metre fell on 3rd to 4th October. David Gómez, deputy mayor for Urban Quality, outlined the city council’s four-part strategy to mitigate future flood risk at this low-lying junction. "The first thing we are doing is managing the elevations so that when surface water arrives, since it is a low-lying spot, it doesn’t flow in here. We will achieve this by raising the elevation level at the street entrances with raised pedestrian crossings, both on carrer de Campoamor and carrer de Caterina Albert," Gómez said.

## Key Measures Include Drainage Upgrades and Water Retention

The second phase will involve modifying a nearby children’s playground to temporarily retain and redirect rainwater, preventing it from flowing directly into streets and homes. The third measure will improve sewer capacity by constructing a new underground conduit between carrer de Campoamor and avinguda d’Amèrica. This will complement the existing pipe and speed up water evacuation to the main drainage network. In parallel, the council is studying the installation of a pumping system at the street’s lowest point. If approved, the system would extract accumulated water during heavy rainfall and divert it to collectors with greater capacity, providing a secondary evacuation route when the main system is overwhelmed.

---

## Residents Still Recovering One Month On

As of 6th November 2026, many residents remained unable to return home. Francisco Mayo and his wife, whose ground-floor flat was almost entirely flooded, said they had only received a damage assessment and were waiting for compensation from the Consorci de Compensació d’Assegurances. "After 24 days, only the adjuster has come, but we don’t know what we’ll be given or what we can do," Mayo said. Maria Isabel and Pedro, also affected, had to buy essential furniture and a portable cooker after all appliances were ruined. "We’ve had to remove the flooring and are advancing a lot of money," Isabel said. Multiple cars in local parking areas remain submerged and covered in mud, with no sign of recovery. The October storm caused 487 reported incidents across L’Hospitalet and over 750 emergency calls to 112, marking it as one of the most intense rainfall events in 114 years of records from the Observatori Fabra.

---

*Sources:* [*LHDigital (L'Hospitalet)*](https://lhdigital.cat/noticies/comencen-les-obres-al-carrer-campoamor-per-prevenir-noves-inundacions/?ref=barna.news)*,* [*Ajuntament de Barcelona*](https://ajuntament.barcelona.cat/premsa/2026/11/13/els-jardins-de-caterina-albert-al-camp-den-grassot-tindran-nous-jocs-infantils-i-mes-zones-dombra/?ref=barna.news)*,* [*lhdigital.cat*](https://lhdigital.cat/noticies/el-veinat-del-carrer-campoamor-un-mes-despres-dels-aiguats/?ref=barna.news)*.*

---

### Related on Barna.News

- [Storm Charles to Bring Heavy Rain, Strong Winds to Barcelona](https://barna.news/storm-charles-to-bring-heavy-rain/)
- [Barcelona rental listings top €30 per square metre](https://barna.news/barcelona-rental-listings-top-30-per/)
- [Caterina Albert Gardens to Be Renovated](https://barna.news/caterina-albert-gardens-to-be-renovated/)
- [Carrer de Pau Alsina Renovation Starts 16 Nov](https://barna.news/carrer-de-pau-alsina-renovation-starts/)