> ## Content Index
> Fetch the complete content index at: https://barna.news/llms.txt
> Use this file to discover other available public pages before exploring further.

# Emergency contracts awarded for Barcelona L2 repairs
- URL: https://barna.news/emergency-contracts-awarded-for/
- Published: 2026-11-18T14:52:37.000Z
- Updated: 2026-11-18T14:52:37.000Z
- Description: Three contracts worth a reported €1.53 million have been awarded as a section of the metro line remains closed until 3rd December.
- Author: Barna.News News Desk
- Tags: Transport

Barcelona’s metro operator has awarded three emergency contracts to repair L2 track at Artigues, with the work valued at €1,533,542, according to reporting published by Metrópoli on 17th November.

For commuters, the repairs mean there are no trains between La Pau and Gorg until the end of service on Thursday 3rd December. Transports Metropolitans de Barcelona (TMB), the city’s public transport operator, expects normal service to resume at 5am on Friday 4th December.

The affected stations are:

- Verneda
- Artigues-Sant Adrià
- Sant Roc

TMB says a shuttle bus service links La Pau and Gorg during the closure. Passengers can check the operator’s [metro works page](https://www.tmb.cat/ca/coneix-tmb/millores-xarxa-transport/metro?ref=barna.news) for service information.

---

## How L2 is running during the repairs

The line is operating in two separate sections: between Paral·lel and La Pau, and between Gorg and Badalona Pompeu Fabra. The interruption began on Monday 2nd November.

TMB says the closure is needed to resolve a problem with the track platform that affected L2 operations in the final days of October. Its published plan keeps the La Pau to Gorg section closed through the end of service on 3rd December, with trains expected to return the following morning.

According to Metrópoli, the operator chose a partial closure because repairs could be completed more quickly than if the whole line remained open. Keeping trains running would have required track rehabilitation at night and a 15 km/h speed limit.

---

## Water and cracks found at Artigues

A routine inspection on 8th October found a significant worsening in the condition of the track at Artigues, Metrópoli reported. TMB said it could have been caused by heavy rain in the province, particularly rainfall on 3rd October.

The inspection found water in the track slab and the layers beneath it, as well as cracks and breaks in the slab at several points. Damage was concentrated near the exit from the track crossovers, where trains can move between tracks.

On 11th October, TMB set alarm thresholds and warnings for significant movement. During the night of 18th to 19th October, work began to anchor the track temporarily to the concrete so trains could continue running at reduced speed, according to Metrópoli.

## What it means for you

- **When:** From Monday 2nd November until Thursday 3rd December 2026, with normal train service expected to resume on Friday 4th December at 05:00.
- **Where:** On L2 between La Pau and Gorg, affecting the stations of Verneda, Artigues-Sant Adrià and Sant Roc.
- **Who is affected:** Users of the L2 metro line between La Pau and Gorg, including those using the stations of Verneda, Artigues-Sant Adrià and Sant Roc.
- **What to do:** Use alternative transport such as L4 at La Pau, L10 at Gorg, tram lines T4, T5 and T6, Rodalies R1, or the shuttle bus service between La Pau and Gorg.

---

*Sources:* [*Metrópoli*](https://metropoliabierta.elespanol.com/movilidad/20261117/metro-barcelona-adjudico-urgencia-millones-euros-empresas-reparar-vias-l2-artigues/1003742812544%5F0.html?ref=barna.news)*,* [*TMB*](https://www.tmb.cat/ca/coneix-tmb/millores-xarxa-transport/metro?ref=barna.news)*.*

---

### Related on Barna.News

- [R7 and R3 Rodalies Lines Cut for Works](https://barna.news/r7-and-r3-rodalies-lines-cut-for-works/)
- [Rodalies delays and T5 tram changes affect journeys](https://barna.news/rodalies-delays-and-t5-tram-changes/)
- [Women's race to disrupt Barcelona trams on 22nd November](https://barna.news/women-s-race-to-disrupt-barcelona-trams/)
- [Updated: Cable theft adds to Rodalies delays in Barcelona](https://barna.news/cable-theft-adds-to-rodalies-delays-in/)