> ## Content Index
> Fetch the complete content index at: https://barna.news/llms.txt
> Use this file to discover other available public pages before exploring further.

# City and Regional Officials to Tour FGC L8 Tunnel Works
- URL: https://barna.news/city-and-regional-officials-to-tour-fgc/
- Published: 2026-09-26T13:59:30.000Z
- Updated: 2026-09-26T13:59:30.000Z
- Description: Barcelona’s First Deputy Mayor and regional ministers will inspect the ongoing FGC L8 extension works at Gran Via on Monday.
- Author: Barna.News
- Tags: Urban Development

Video: [Territori, Habitatge i Transició Ecològica](https://www.youtube.com/@territori%5Fcat?ref=barna.news) / YouTube

## Officials to Inspect L8 Extension Site

On Monday, 28 September 2026, Barcelona’s First Deputy Mayor, Laia Bonet, will join regional officials for a visit to the construction site of the FGC L8 line extension at the Gran Via de les Corts Catalanes access shaft. The inspection begins at 12:30 PM at the tunnel boring machine’s entry point, located at Gran Via 408\. Also attending are Sílvia Paneque, Minister of Territory, Housing, and Ecological Transition, and Carles Ruiz, President of Ferrocarrils de la Generalitat de Catalunya (FGC), the regional rail operator responsible for the project.

---

## Site Visit and Safety Protocols

The delegation will first descend into the access shaft, followed by technical presentations and institutional remarks at ground level starting at 1:00 PM. The event offers a rare opportunity to observe one of the most complex underground infrastructure projects currently underway in central Barcelona. Media wishing to cover the event must register in advance by emailing [premsa.tes@gencat.cat](mailto:premsa.tes@gencat.cat), providing full name, ID number, and affiliated media outlet. For safety reasons, long trousers and closed, comfortable footwear are required.

> Only visual media representatives may descend into the shaft, and those intending to do so must include their shoe size during accreditation.

Photographers and camera operators are advised to arrive at the meeting point by 12:15 PM. Other media should arrive at 1:00 PM for the above-ground segment.

### Public Access and Broader Context

The visit follows a series of public open days held during the European Mobility Week (16–22 September), which included limited guided tours of the same site. According to reports from the Department of Territory, these initiatives aim to increase transparency around major public transport infrastructure and promote sustainable mobility. Further information about public visits and project updates can be found via the [FGC Transparency Portal](https://transparencia.fgc.cat/es/informacion-publica/planes-y-programas/evaluacion-de-planes-y-programas/analisi-cost-benefici-projectes%5Fpla-dactuacio-fgc-2022-2026%5F20211126.pdf?ref=barna.news), which includes socio-economic impact assessments for the 2022–2026 investment plan.

---

*Primary sources:* [*ajuntament.barcelona.cat*](https://ajuntament.barcelona.cat/premsa/2026/09/25/laia-bonet-assisteix-a-la-visita-de-les-obres-de-ll8-dfgc-al-pou-datac-de-la-gran-via/?ref=barna.news)*. Reported by elnacional.cat, beteve.cat, 20minutos.es, Descarga nuestra APP, transparencia.fgc.cat.*

---

### Related on Barna.News

- [Barcelona caps parking in new homes near public transport](https://barna.news/barcelona-caps-parking-in-new-homes/)
- [Barcelona tenders La Sagrera Metro access works](https://barna.news/barcelona-tenders-la-sagrera-metro/)
- [Generalitat to open support office for L9 sinkhole residents](https://barna.news/generalitat-to-open-support-office-for/)
- [Barcelona port plans biometric access checks in 2027](https://barna.news/barcelona-port-plans-biometric-access/)