> ## Content Index
> Fetch the complete content index at: https://barna.news/llms.txt
> Use this file to discover other available public pages before exploring further.

# Barcelona metro train to move by road for L9 tests
- URL: https://barna.news/barcelona-metro-train-to-move-by-road/
- Published: 2026-11-28T09:08:23.000Z
- Updated: 2026-11-28T12:30:14.000Z
- Description: A five-carriage train is due to leave L9 Sud for the northern section, where it will test infrastructure at La Sagrera, Maragall and Guinardó.
- Author: Barna.News News Desk
- Tags: Transport, Trending Now

Barcelona metro operator Ferrocarril Metropolità de Barcelona (FMB) has put the road transfer of an L9 Sud train out to tender so it can be used to test a new northern section of lines L9 and L10\. For passengers, the work is a step towards bringing the section serving La Sagrera, Maragall and Guinardó into use.

According to project documents reported by Metrópoli Abierta, the five-carriage, 9000-series train will be taken out of service on the southern section and moved to the north for the technical tests needed to authorise the infrastructure. FMB is the metro company within Transports Metropolitans de Barcelona (TMB), the city’s public transport operator.

The transport contract has a base tender budget of €60,500 and a planned term of 16 months, without extensions. It is scheduled to start on 1st June 2027 and end on 30th September 2028; those dates are for the contract, not a published timetable for the road journeys.

---

## Five carriages to travel separately

The train will travel from the ZAL rolling stock workshop on Carrer A in Zona Franca to the Triangle Ferroviari workshop on Carrer de Jaume Brossa. A specialist contractor will use low-loader vehicles on public roads because the operator does not have suitable flatbed trucks for this type of one-off transfer.

FMB staff will first uncouple the train on track 17 at the ZAL workshop and leave each carriage unbraked. The company awarded the contract will then move, load, transport and unload the cars individually, with only one carriage allowed on each low-loader per journey.

The contractor will also have to:

- Obtain the permits required for the special transport.
- Coordinate with police, including the Guàrdia Urbana.
- Check access clearances at both workshops before the move.
- Inspect each carriage at ZAL and again at Triangle Ferroviari after its journey to check for damage.

---

## Wider plans for the L9 fleet

The road transfer is separate from a larger procurement for new metro trains. In a [2025 budget and investment plan approved by its board in 2024](https://transparencia.tmb.cat/documents/525003/1bc9993a-42f2-357a-d59a-5aa9c2f77a14?ref=barna.news), FMB said it had 28 trains of the 9000 series on the northern and southern L9 and L10 sections.

FMB said 22 others from the original fleet of 50 had been transferred to L2 because infrastructure was unavailable. Its plan envisaged adapting and returning those trains to L9 for the central section, while buying 22 new trains for L2.

More recently, El Periódico reported on 25th November 2026 that Alstom was the [sole bidder](https://barna.news/alstom-sole-bidder-for-412m-barcelona/) in a separate tender for 35 new trains. FMB’s [July 2026 procurement approval](https://contractaciopublica.cat/portal-api/descarrega-document/302641071/388701C56A6C2D599E4CC0C47E8E08EA?ref=barna.news) gives that contract an estimated value of €412.5 million.

## What it means for you

- **When:** The operation is scheduled to start on 1st June 2027 and be completed by 30th September 2028.
- **Where:** The train will be moved from the ZAL Rolling Stock workshop on carrer A in Zona Franca to the Triangle Ferroviari workshop on carrer de Jaume Brossa.

---

*Sources:* [*Metrópoli Abierta (CA)*](https://www.metropoliabierta.cat/viure-a-barcelona/20261127/tmb-traslladara-carretera-tren-l9-sud-tram-nord-iniciar-proves-sagrera-maragall-guinardo/1003742815873%5F0.html?ref=barna.news)*,* [*TMB*](https://transparencia.tmb.cat/documents/525003/1bc9993a-42f2-357a-d59a-5aa9c2f77a14?ref=barna.news)*,* [*El Periódico*](https://www.elperiodico.cat/barcelona/20261125/alstom-opta-solitari-gran-contracte-136816855?ref=barna.news)*,* [*contractaciopublica.cat*](https://contractaciopublica.cat/portal-api/descarrega-document/302641071/388701C56A6C2D599E4CC0C47E8E08EA?ref=barna.news)*.*

---

### Related on Barna.News

- [New Rodalies trains pass approval for passenger service](https://barna.news/new-rodalies-trains-pass-approval-for/)
- [Catalan government and Renfe sign Rodalies deal](https://barna.news/catalan-government-and-renfe-sign/)
- [Barcelona Police Warn Against Roadway Selfies](https://barna.news/barcelona-police-warn-against-roadway/)