> ## Content Index
> Fetch the complete content index at: https://barna.news/llms.txt
> Use this file to discover other available public pages before exploring further.

# Acciona-Tecmosa to Renovate Barcelona Airport T2
- URL: https://barna.news/acciona-tecmosa-to-renovate-barcelona/
- Published: 2026-11-20T18:45:33.000Z
- Updated: 2026-11-20T18:45:33.000Z
- Description: Acciona and Tecmosa are the sole bidders for a €49.86m overhaul of Terminal 2 at Barcelona-El Prat Airport, set to improve passenger flow and facilities by 2032.
- Author: Barna.News News Desk
- Tags: Transport

## Only Bid Submitted for €54m Terminal Upgrade

A temporary joint venture between Acciona and Tecmosa is the only company to bid for the major renovation of Terminal 2 at Josep Tarradellas Barcelona-El Prat Airport. The bid, valued at €49.86 million, was submitted for the €53.89 million contract advertised by Aena, the Spanish airport authority, representing a 7.47% reduction on the tender budget. The 20-month project will focus on modernising key passenger areas in both T2A and T2B, including check-in and baggage reclaim zones, departures and arrivals halls, and security checkpoints in the Intermodal and Olympic sections. The work forms part of a broader €153.4 million investment by Aena to comprehensively remodel Terminal 2 by 2032.

---

## Major Overhaul to Enhance Passenger Experience

According to Aena, this will be the most significant transformation of Terminal 2 since the pre-Olympic upgrades of 1992\. The terminal, originally built in 1963 and expanded in stages, has become architecturally fragmented. The renovation aims to "stitch together" these phases while preserving the building’s architectural identity. One of the most visible changes will be the renovation of the terminal’s main facade, which will feature improved climate insulation and enhanced natural lighting. Interior upgrades will include new ceilings and flooring in the concourse and lobby areas, LED lighting, and reorganised post-security spaces to include family lounges and staff workrooms.

> The objective is to offer passengers the perception of a terminal completely renewed, modern, coherent and fully integrated, while maintaining its architectural identity.

, Eva Valenzuela, Airport Director

---

## Green Gateway and Improved Access

The future T2 will be reconfigured as a "gateway to Barcelona", anchored by a new green axis incorporating Mediterranean vegetation such as olive trees, palm trees, cypresses and rosemary fields. Urban furniture and lighting will be integrated into this landscape. Passenger access will be improved through the relocation of Renfe and metro stations to the basement of the intermodal lobby, requiring the demolition of the current walkway. New escalators will be installed, and part of the security checkpoint facade will be moved outward to expand waiting areas. The bike lane will be renewed and digital wayfinding screens installed. The renovation will also allow the reopening of the check-in area in T2A, which currently only handles arrivals. Opposite this area, a new four-star hotel and remodeled parking building are planned.

### Project Timeline and Ongoing Works

Electromechanical upgrades have already begun under a separate €10.7 million contract. The terminal adaptation work, now contracted to Acciona-Tecmosa, will start in the coming months. Additional investments include:

- €20.3 million for the Hold Baggage Screening System (SIEB)
- €68.1 million for broader facility improvements

All works are scheduled for completion between 2031 and 2032\. Aena continues to assess the feasibility of relocating the Joan Miró mural from the current facade to Terminal T1.

---

*Sources:* [*Metrópoli*](https://metropoliabierta.elespanol.com/gran-barcelona/20261120/acciona-tecmosa-quedan-solas-puja-nueva-gran-reforma-t2-aeropuerto-barcelona/1003742813691%5F0.html?ref=barna.news)*,* [*aena.es*](https://www.aena.es/es/prensa/aena-impulsa-la-mayor-transformacion-de-la-terminal-t2-desde-su---construccion-con-una-inversion-de-mas-de-153-millones-de-euros.html?ref=barna.news)*.*

---

### Related on Barna.News

- [Badal Metro Station Platform Work Next Week](https://barna.news/badal-metro-station-platform-work-next/)
- [Sants station moves passenger drop-off point](https://barna.news/sants-station-moves-passenger-drop-off/)
- [Giant Christmas Bell Blocks Bike Lane on Diputació](https://barna.news/giant-christmas-bell-blocks-bike-lane/)
- [Crowds at La Sagrera metro after rail strike](https://barna.news/crowds-at-la-sagrera-metro-after-rail/)